Site chemung_basin_ny. Flood readiness is only driven by the
Flood COP and Operator PWA.
Each role is a separate program over shared truth — not a parallel system.
Job access is loose (cookie / query); not full login yet.
Planning/IC: SA chat audit log (accountability / AAR).
Select job description (acting as)
Mode: soft
· set via EWS_JOB_ACCESS_MODE=soft|enforce|off.
Soft shows banners; enforce returns 403 on unauthorized programs.
Current: Not selected (pilot — full access until you pick a job)
Capabilities: ack_alert, draft_pio, ics_notify_force, ics_notify_status, open_all_programs, print_reports, sa_assistant, share_location, system_admin, view_cop, view_personnel, view_sa_audit, worksheets
Incident Commander authorized
Posture, basin driver, ICS notify status, open Flood COP.
Operations authorized
Gauge readiness context and recommended review actions (not field dispatch).
Planning authorized
COP trends, freshness, outlook context, field presence counts.
Logistics authorized
Resource readiness prompts from current posture.
Safety authorized
Life-safety review language and map hazards context.
Public Information authorized
Draft messaging prompts only — requires IC/EOC approval before any public release.
Field team authorized
Share location for the COP map, ack path via Operator PWA, mini map.
ICS notify (this process)
Enabled: False
Live email stays off until county roster emails are filled and EWS_ICS_NOTIFY_ENABLED=1. Use dry-run CLI for rehearsals. Force routes still need EWS_OPERATOR_WRITE_TOKEN.
HAND sketch (lab / demoted) lab
Geometric height-above-nearest-drainage wet-area sketch. Not a hydraulic model — not recommended for EM briefings or COP decisioning. Prefer Flood COP gauges, MARFC, local impacts, and practice replay. Does not change flood readiness.
Open lab HAND tool
Set EWS_HAND_SKETCH_UI=hidden to remove this entry.